HF Melamine Preheating Equipment

Shunhao Brand 3KW, 5KW, 10KW melamine preheating machines available

Features and benefits
  • Support Service :

    Life-time Service
  • Trainning Service :

    Yes
  • Machine Weight :

    600KG
  • Machine Dimension :

    1150×820×1720
Product Details

Advantages of Shunhao Melamine Preheating Machine:

1. Easy to operate, and electric saving

2. Top brand parts used: Canon tube,Japan Toshiba, Omron, etc

3. Hard quality & 1-year warranty

4. Strong wooden box packing and safe deliver

5. China High quality preheaters supplier

Shunhao melamine preheating machine


Technical Parameters

No

Content.

HGY-1020

1

Output10

KW

2

Power Source

3Φ220V

380V

415V

3

Power Input

20KVA

4

Oscillation Frequency

27MHZ

5

Vacuum Tube

8T85RB


6

Voltage Switching

3-stage

7

Preheating Power

110℃ Within 60 secs

8

Phenolic Resin

6500gr

9

Melamine Moulding Compound

6000gr

10

Urea Moulding Compound

6000gr

■ PS: Specifications subject to change without notice.


melamine powder preheating machine


How to maintain the HF preheating machine?

  1. In the process of use, the air gun is often used to clean up the dust and debris in the working room.
  2. Regularly (at least once a month) use an air gun to remove dust and impurities in the oscillation chamber, working room, and lower cabinet.
  3. Regularly (at least once a month) wipe the electrode rollers and edge plates in the working chamber with volatile solvents (such as toluene).
  4. Regularly (at least once a week) check the four weeks of the upper cover Whether the contact between the phosphor bronze sheet and the yellow angle steel is good, if there is blackening or Oxidation should be polished in time.
  5. Regularly (at least once a week) check whether the position of the connecting rod flywheel is deviated. Under normal conditions: when the upper cover is closed, the flywheel hole is directly above: when the upper cover is opened, the flywheel hole is directly below. If it deviates, please adjust the corresponding micro switch in the chassis in time.
  6. Regularly (depending on site conditions at least once a week or a month) clean the air inlet filter of the whole machine.
  7. After the power is turned on every day, turn off the "high voltage", and the machine runs a cycle of working procedures without load before entering work.


Send your message to this supplier
* Email:
* To: QUANZHOU SHUNHAO MOULDS CO.,LTD
* Message

Enter between 20 to 4,000 characters.

WhatsApp
Haven't found the right supplier yet ? Let matching verified suppliers find you.
Get Quotation Nowfree
Request for Quotation

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

home

products

about

contact