Compression Molding for Duroplast Toilet Seat

Compression Molding for Duroplast Toilet Seat
Product Details

Product Overview


Product Name: Compression Molding for Duroplast Toilet Seat

Product Introduction: Duroplast (UF) Toilet Seat is made by compression molding, and with separated molds for seat and cover.

Mold steel: S136

No. of cavities: 1*1

Part Material: PC/ABS

Mold Base: LKM/HASCO/DME

Surface treatment: Texture/High Glossy/polishing

Runner: Hot runner/Cold runner

Shaping mode: Plastic Injection Molding

Mold lifetime: 100,000~1,000,000 shots


Trade Information


MOQ: 1 set

Mold lead time: 3~7 weeks for T1

Production lead time:2~5 weeks, according to order qty

Mold payment terms: 50% deposit by T/T against PO, balance by T/T after approval of samples but before shipment 

Products payment terms: 30% deposit by T/T against PO, balance by T/T before shipment

Port of loading: Xiamen or other China port, as per customers' requirements


Product Image



Our Services


QQS Moulds provides services of plastic part design, prototype making, mold design, mold production, mass production in house. Moreover, we have reliable partner for painting, PCBA making and final assembly. We are working with many clients both home and abroad, and we keep every process very transparent with customers, because we hope to have a win-win situation for both parties.


Our Equipment


Customers Visit



Packing



Usually, we make use cartons for plastic parts, and wooden case for molds, which are suitable for sea & air shipment.






Our Certificates



FAQs


Q: Is duroplast made by compression molding?

A: Yes, duroplast toilet seat is made by compression molding.


Q: Do you have injection machine to produce the parts?

A: Yes, we have our own injection shop, so we can make the production & assembling for customers, if request.


Q: What kind of molds are you making?

A: We mainly make plastic injection molds, but we can also build compression molds (for UF or SMC material) & die casting molds.


Q: How long does it take to build a mold?
A:It varies a little depending on the product sizes and complexity of part, generally speaking, a medium size mold can be finished for T1 within 25~30 days.


Q: Is it possible for us to know the schedule of molds without visiting your factory?
A:Upon the contract, we will send you a mold production schedule, and during the production, we will keep you updated by weekly report with related pictures. So, you can know the schedule of your molds clearly.


Q: How do you guarantee the quality?

A: We will appoint a project manager to follow your molds, who is responsible for every process. Besides that, we have QC for every procedure, and we will also have CMM & online inspection system to guarantee all components to be within the tolearance.


Q: Do you support OEM ?
A:Yes, we can produce by technical drawings or samples. 


Q: What kind of resin do you proceed with?
A:We proceed with both thermoplastic and thermoset.


Send your message to this supplier
* Email:
* To: XIAMEN QIQIANGSHENG MOULDS CO., LTD.
* Message

Enter between 20 to 4,000 characters.

WhatsApp
Haven't found the right supplier yet ? Let matching verified suppliers find you.
Get Quotation Nowfree
Request for Quotation

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

home

products

about

contact